We already have the 3D design of our motors, so this week we done the drawings of the motor and also of the documentation that we need in order to do the memory of the project. This is the last week to finish this short project, so ,the last day before the winter holidays we turn In the project. Remaining only the presentation of it.

Also,because is the last week to finish the motor and the last week before holidays, this was a “light” week. Apart of finish the project we only watched a film in English subject, a film called “Catch a Fire”  

Andoni soto

Fourteenth week

To start this week we had to complete our 3D design of our motor for the design proyect with Salesianos. In this proyect we had to make the notebook with the diferent points we processed. Once we finnished it, we only had to do the ppt of the presentation.

Apart of the motor proyect we have no other special things to do in class. In english we started a film called Catch a Fire and we saw it in a few classes.


ANTON EGUIA


All this week we have to make the design of our pneumatical motor, another time to comply the terms of the challenge. We have done the 3D design in the software Solidworks, because they dont use Catia. In the design we done there are some things we have to change because the geometrical parameters and the funtion of the design of the pneumatical motor. 
In the subject of english we started to watch a film called Catch a fire. There is not time to watch it in one class, so we have to use two classes to watch it at all.

Diego Mateo


We have continued making the engine in which we are working with the Salesianos colleagues, the design is finished, also the plans and the report that goes with them.We also saw a movie called Catch on Fire in English, it was a special day.We continue working in Catia normally.