Yaiza Guerra 



This week is very similar to the previous one . We are on the last week of the design and we are late. We have little time to finish the design of the die before the student of mechanical course started to make it , the teachers delayed the date to finish it but still, we are late. So in the next week we need to dedicate most of our time to finish the design.

So this week we distribute the work the same way. Some of team members make the calculus and after that started doing the memory of the project and started ordering the data of the calculus. This way the teams members that are with the commercial elements can search quickly for the data they need to choose the elements.

In my case I continue with the design in CATIA.  I finished witch the elements that we don’t need to design, the elements that the give us. Once I finish it a started with the design of our elements. I take the design of the sheet , and I do the work basing on it . I started making the die (“matriz”) for the cutting and blending operations.  After making them I put them in the correct places of the die ,and once in the place they need to be I adjusted the die plate. Making in the die plate the cavities necessaries to put the dies inside them. 



I also insert in the design some of the draw of the commercial elements that my teammates make. The commercial dies for example. 









ANDONI SOTO


In the tenth week Anton and me finished the calculations, we made a Excel top ut all the answers together and for having it all organized. When the Excel was completed we passed it to a Word completting that part of the report. Then I started making the report putting together all the parts done before by all the teamates, everyone have done his part and putted in Drive.


The last 3 weeks has been all similar for the team because the proyect occupies all the time of the clasess and we have to use the time we have the best to finnish the die.



In EAE and Catia`s clasess we have done the same as the past week.



ANTON EGUIA


This week we have done the same than the last. We are updating the design about the die, improving details about it. We have to finish this work fastly to make the planes to manufacture the pieces inmediately.

I think that if we make these planes as son as we can, we will detect the problems sooner, so the most important think is on it.

For this, the better way to solv these problems is to distribute the work with criterion, so we think that all the members of the team would make a part of the work. So, we have distributed the work like before: Calculous, materials, design, standarized elements of the die, administration of the team and the business plan.

Resultado de imagen de ADMINISTRAR TRABAJO

We have update our pieces and design in Catia too but we havent had a clases about it, we have update our ‘Design tree’ for it with Gaizka. With Ane we have learned to start a Little business and the necessary parameters for it.

With Richard we have done grammatical  excercises about our degree to improve our skills and take better the way to talk in english. Also we have update the blog.



No comments: